<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:yandex="http://news.yandex.ru" xmlns:media="http://search.yahoo.com/mrss/" xmlns:turbo="http://turbo.yandex.ru">
<channel>
<title>MITIME INTERNATIONAL CO.,LTD</title>
<link>https://en.mitime.mn/</link>
<description>MITIME INTERNATIONAL CO.,LTD</description><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=66</link>
<author>admin</author>
<category>Highlights</category>
<pubDate>Mon, 04 May 2026 13:03:21 +0800</pubDate>
<turbo:content><![CDATA[<p style="border:0px solid rgb(229,231,235);font-family:Montserrat, sans-serif;margin:0px;color:rgb(26,26,26);font-size:14px;font-style:normal;font-weight:400;letter-spacing:normal;text-align:justify;text-indent:0px;text-transform:none;word-spacing:0px;white-space:pre-line;"><span style="font-family:'Times New Roman', Times, serif, '-webkit-standard';">The construction of “Thermal Power Plant No. 5 (TPP-5)” officially commenced today (May 4, 2026). The plant will be built on 26.4 hectares of land located in the 20th subdistrict of Bayangol District in Ulaanbaatar, utilizing the ash disposal site area of Thermal Power Plant No. 2.<br style="border:0px solid rgb(229,231,235);font-family:Montserrat, sans-serif;">The groundbreaking ceremony was attended by Minister of Energy B. Naidalaa, Mayor of Ulaanbaatar and Governor of the Capital City Kh. Nyambaatar, representatives of the private partner “Mitime International” company, and other relevant officials.<br style="border:0px solid rgb(229,231,235);font-family:Montserrat, sans-serif;">In his opening remarks, Mayor Kh. Nyambaatar stated: “Half of Mongolia’s population resides in Ulaanbaatar, accounting for more than 60% of the country’s total electricity consumption. Energy demand in the capital continues to grow steadily each year. In the winter of 2025, peak load exceeded 1,700 MW, reaching 1,743 MW in December. At the same time, the minimum load reached 1,284 MW, indicating a high base consumption level. This shows that Ulaanbaatar’s energy system is currently operating at its maximum capacity with limited reserve power.</span></p><p style="border:0px solid rgb(229,231,235);font-family:Montserrat, sans-serif;margin:0px;color:rgb(26,26,26);font-size:14px;font-style:normal;font-weight:400;letter-spacing:normal;text-align:justify;text-indent:0px;text-transform:none;word-spacing:0px;white-space:pre-line;"><span style="font-family:'Times New Roman', Times, serif, '-webkit-standard';">In particular, the rapid expansion of residential areas in the western zone, along with increasing housing development, has created an urgent need for new sources of heat and electricity. Under these conditions, the city has identified the development of new energy sources as a top policy priority and is actively participating as a public partner to turn this project into reality.”</span></p><p><span style="font-family:'Times New Roman', Times, serif, '-webkit-standard';"><span style="color:rgb(26,26,26);font-size:14px;font-style:normal;font-weight:400;letter-spacing:normal;text-align:justify;text-indent:0px;text-transform:none;word-spacing:0px;white-space:pre-line;float:none;display:inline;"> </span></span><span style="font-family:'Times New Roman', Times, serif, '-webkit-standard';">The plant will have a capacity of 300 MW of electricity and 340 Gcal/hour of heat. Once operational, it will provide an independent and reliable source of energy and heating for the western part of the capital. It will ensure stable supply for densely populated and rapidly expanding areas such as Tavanshar, Bayankhoshuu, the 21st microdistrict, and the 3rd and 4th microdistricts.</span></p><p><a class="highslide" href="https://en.mitime.mn/uploads/posts/2026-05/1778907880_123.jpg" target="_blank"><img src="https://en.mitime.mn/uploads/posts/2026-05/thumbs/1778907880_123.jpg" alt="" class="fr-dib"></a></p><p><a class="highslide" href="https://en.mitime.mn/uploads/posts/2026-05/33333.jpg" target="_blank"><img src="https://en.mitime.mn/uploads/posts/2026-05/thumbs/33333.jpg" alt="" class="fr-dib"></a></p><p><a class="highslide" href="https://en.mitime.mn/uploads/posts/2026-05/123456.jpg" target="_blank"><img src="https://en.mitime.mn/uploads/posts/2026-05/thumbs/123456.jpg" alt="" class="fr-dib"></a></p><p><br></p><p><br></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=65</link>
<author>admin</author>
<category>Highlights</category>
<pubDate>Wed, 22 Apr 2026 16:28:03 +0800</pubDate>
<turbo:content><![CDATA[<p>The “Fifth Thermal Power Plant (CHP-5)” will be constructed on a 26.4-hectare site located in the 20th khoroo of Bayangol District, Ulaanbaatar, utilizing the ash disposal area of Thermal Power Plant No. 2.</p><p>Thermal Power Plant No. 2 has been in operation since 1961, and the removal of ash accumulated over 65 years from the site has commenced as of today (April 22, 2026). <a href="https://ipiu.mn/tpp5/articles/69e85cea36fab8c81f2d49b6" rel="noopener noreferrer external" target="_blank">https://ipiu.mn/tpp5/articles/69e85cea36fab8c81f2d49b6</a></p><p><a class="highslide" href="https://en.mitime.mn/uploads/posts/2026-04/64d46c33-a900-4a2e-9af1-a61ea01964df.jpg" target="_blank"><img src="https://en.mitime.mn/uploads/posts/2026-04/thumbs/64d46c33-a900-4a2e-9af1-a61ea01964df.jpg" alt="" class="fr-dib"></a><img src="https://en.mitime.mn/uploads/posts/2026-04/thumbs/167f57f1-df61-4b88-8644-caf0e822eec1.jpg" alt="" class="fr-dib"></p><p><a class="highslide" href="https://en.mitime.mn/uploads/posts/2026-04/a97f57ad-4fbb-469e-a2e6-636584f788a3.jpg" target="_blank"><img src="https://en.mitime.mn/uploads/posts/2026-04/thumbs/a97f57ad-4fbb-469e-a2e6-636584f788a3.jpg" alt="" class="fr-dib"></a></p><p><a class="highslide" href="https://en.mitime.mn/uploads/posts/2026-04/a5968e8b-0e96-469b-801e-ae9761fd52a8.jpg" target="_blank"><img src="https://en.mitime.mn/uploads/posts/2026-04/thumbs/a5968e8b-0e96-469b-801e-ae9761fd52a8.jpg" alt="" class="fr-dib"></a></p><p><a class="highslide" href="https://en.mitime.mn/uploads/posts/2026-04/e5f4e286-d73c-429a-ba3e-09068b5fb864.jpg" target="_blank"><img src="https://en.mitime.mn/uploads/posts/2026-04/thumbs/e5f4e286-d73c-429a-ba3e-09068b5fb864.jpg" alt="" class="fr-dib"></a></p><p><br></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=64</link>
<author>admin</author>
<category>News</category>
<pubDate>Mon, 13 Apr 2026 16:24:49 +0800</pubDate>
<turbo:content><![CDATA[<p style="border:0px solid rgb(229,231,235);font-family:Montserrat, sans-serif;margin:0px;color:rgb(26,26,26);font-size:14px;font-style:normal;font-weight:400;letter-spacing:normal;text-align:justify;text-indent:0px;text-transform:none;word-spacing:0px;white-space:pre-line;"><span style="font-family:'Times New Roman', Times, serif, '-webkit-standard';">A total of 26 land units were affected by the route of the “Thermal Power Plant No. 5 (TPP-5)” project. As of now, 25 units have been fully cleared, with only one remaining. Completing the land clearance will create the fundamental conditions necessary to accelerate the project’s construction.</span></p><p><span style="font-family:'Times New Roman', Times, serif, '-webkit-standard';"><span style="color:rgb(26,26,26);font-size:14px;font-style:normal;font-weight:400;letter-spacing:normal;text-align:justify;text-indent:0px;text-transform:none;word-spacing:0px;white-space:pre-line;float:none;display:inline;"> </span>The plant will be built on 26.4 hectares of land in the 20th subdistrict of Bayangol District, utilizing the ash disposal site area of Thermal Power Plant No. 2. It is planned to have a capacity of 300 MW of electricity per hour and 340 Gcal of thermal energy. Once operational, the plant will supply electricity to 100,000 households and heating to 40,000-50,000 households. It will reliably provide thermal energy to areas such as Tavanshar, the 21st microdistrict, “Hilchin” complex, Bayankhoshuu, the 3rd and 4th microdistricts, and the 1st microdistrict, becoming the main heat source for the northwestern part of Ulaanbaatar.</span></p><p><span style="font-family:'Times New Roman', Times, serif, '-webkit-standard';">The project will be implemented under a public-private partnership (PPP). The financing structure consists of 20% from the city budget and 80% from a private partner. The private partner is “Mitim International” company. The total duration of the partnership agreement is 27.5 years, including 2.5 years for construction and 25 years for operation. The goal is to complete construction and commission the plant by the third quarter of 2028.<br style="border:0px solid rgb(229,231,235);font-family:Montserrat, sans-serif;">To raise financing domestically, the city has issued bonds in the capital market. These bonds have a 3-year term, an annual interest rate of 14%, and a nominal value of 1 million MNT each, with a total of 200,000 bonds offered publicly. Through this, 200 billion MNT will be raised in 2026 to finance the project, with construction planned to be completed within 30 months.</span></p><p><span style="font-family:'Times New Roman', Times, serif, '-webkit-standard';"><span style="color:rgb(26,26,26);font-size:14px;font-style:normal;font-weight:400;letter-spacing:normal;text-align:justify;text-indent:0px;text-transform:none;word-spacing:0px;white-space:pre-line;float:none;display:inline;"> </span>The project’s feasibility study and environmental impact assessment have been completed. These assessments evaluated potential positive and negative impacts on the local ecosystem, soil cover, water resources, air quality, flora, and fauna. The conclusion indicates that the project will not cause significant harm to the natural ecosystem. Additionally, environmentally friendly technologies will be used to minimize negative impacts. These include circulating fluidized bed boilers to reduce nitrogen and sulfur oxide emissions, air-cooled condensers to reduce water consumption, wastewater treatment systems, and dry ash handling technology that allows ash to be reused in construction materials.</span></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=63</link>
<author>mitime</author>
<category>Technique and Equipment</category>
<pubDate>Mon, 15 Dec 2025 15:58:49 +0800</pubDate>
<turbo:content><![CDATA[<p><a class="highslide" href="https://mitime.mn/uploads/posts/2025-12/sinotruck-r-buulgagch-mashin-7sh.png" target="_blank"><img src="https://mitime.mn/uploads/posts/2025-12/thumbs/sinotruck-r-buulgagch-mashin-7sh.png" alt="" class="fr-dib"></a><br></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=62</link>
<author>mitime</author>
<category>Technique and Equipment</category>
<pubDate>Mon, 15 Dec 2025 15:58:27 +0800</pubDate>
<turbo:content><![CDATA[<p><a class="highslide" href="https://mitime.mn/uploads/posts/2025-12/shaanxi-howo-markyn-mikser-6-10-m3-bagtaamzhtai-5sh.png" target="_blank"><img src="https://mitime.mn/uploads/posts/2025-12/thumbs/shaanxi-howo-markyn-mikser-6-10-m3-bagtaamzhtai-5sh.png" alt="" class="fr-dib"></a><br></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=61</link>
<author>mitime</author>
<category>Technique and Equipment</category>
<pubDate>Mon, 15 Dec 2025 15:57:58 +0800</pubDate>
<turbo:content><![CDATA[<p><img src="https://mitime.mn/uploads/posts/2025-12/shantui-bulldozer-2sh.png" alt="" class="fr-dib"><br></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=60</link>
<author>mitime</author>
<category>Technique and Equipment</category>
<pubDate>Mon, 15 Dec 2025 15:57:25 +0800</pubDate>
<turbo:content><![CDATA[<p><img src="https://mitime.mn/uploads/posts/2025-12/zoomlion-ginzhit-kran-100tn-1sh.png" alt="" class="fr-dib"><br></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=59</link>
<author>mitime</author>
<category>Technique and Equipment</category>
<pubDate>Mon, 15 Dec 2025 15:57:08 +0800</pubDate>
<turbo:content><![CDATA[<p><a class="highslide" href="https://mitime.mn/uploads/posts/2025-12/beton-zuurmagyn-uzel-1-cagt-90m3-ildverleh-hchin-chadaltai.png" target="_blank"><img src="https://mitime.mn/uploads/posts/2025-12/thumbs/beton-zuurmagyn-uzel-1-cagt-90m3-ildverleh-hchin-chadaltai.png" alt="" class="fr-dib"></a><br></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=58</link>
<author>mitime</author>
<category>Technique and Equipment</category>
<pubDate>Mon, 15 Dec 2025 15:56:33 +0800</pubDate>
<turbo:content><![CDATA[<p><a class="highslide" href="https://mitime.mn/uploads/posts/2025-12/sany-excavator-3sh.png" target="_blank"><img src="https://mitime.mn/uploads/posts/2025-12/thumbs/sany-excavator-3sh.png" alt="" class="fr-dib"></a><br></p>]]></turbo:content>
</item><item turbo="true">
<turbo:extendedHtml>true</turbo:extendedHtml>
<link>https://en.mitime.mn/index.php?newsid=57</link>
<author>mitime</author>
<category>Technique and Equipment</category>
<pubDate>Mon, 15 Dec 2025 15:56:10 +0800</pubDate>
<turbo:content><![CDATA[<p><a class="highslide" href="https://mitime.mn/uploads/posts/2025-12/xcmg-zoomlion-avtokran-150tn-50tn-2sh.png" target="_blank"><img src="https://mitime.mn/uploads/posts/2025-12/thumbs/xcmg-zoomlion-avtokran-150tn-50tn-2sh.png" alt="" class="fr-dib"></a><br></p>]]></turbo:content>
</item></channel></rss>